In some instances additional hinges will be required for particularly large or wide fire doors and you should always consult the.
Fire rated door installation method statement.
Frames are 1 4mm thick and 100mm x 100mm x nom.
Maxi fire doors.
Hinges a minimum of 3 fire rated hinges must be used with correct intumescent pads location and fixings.
Method of statement for wood door installation.
Installation as per approved method statement and material.
Civil method statements tags.
Frames are 1 1mm thick and 100mm x 75mm x nom.
Scope of work 2 1.
2 5mm thick heavy duty hinges to be used.
Fire sound method statement f s ms04.
2 5mm thick heavy duty hinges to be used.
This method statement refers to various work procedures which explains and covers the installation of hvac supply return exhaust ducts dampers fire damper and access doors.
For fire rated installations the studs should be cut 15mm short of the full height to allow expansion in the event of a fire alternative head assembly details can be formed using tf202 galvanised steel track and a choice of offset cover trims.
If you install a fire door incorrectly there are 4 main risks.
This swms covers high risk construction work hrcw controls related to.
Signage correct fire door signage should be fitted on all non domestic fire doors at eye level.
Wood door installation method of statement includes the following.
General description the primary reason for generating this method statement is to explain the installation process of non fire rated insulated roller shutter door as a specified requirement sp section 0000 and as illustrated in standard related drawings.
Mini fire doors.
Title the installation method of non fire rated insulated roller shutter door 2.
Ensure all spaces are filled with insulation material.
This fire door installation safe work method statement swms covers hazards and controls associated with the general aspects of fire door installation in residential and commercial buildings.
This method statement covers work for the project.
Ensure that all recessed panels electrical outlets light switch boxes etc are encased with fire barrier seal wrap to seal all gaps and maintain continuity in fire and smoke protection in all fire rated assemblies.
Non fire rated semi slid core custom fabricated wood door access doors.
Mini fire doors.
All frames to be backfilled as required.
Door frame procedure door method metal doors installation post navigation method statement for aluminum glazing cladding works accessories safe work method statement for premix plastering work.
Wood veneer solid hardwood raised panels and stained varnish materials for application.
Mobile plant movement pressurised.