The glue down method of engineered wood flooring installation is typically the most common and creates a highly stable floor.
Floating engineered wood floor over concrete.
You ll want to install an underlayment on concrete floor in basement.
When we talk about a floating floor it means that the hardwood floor is not permanently attached to the subfloor.
3 things to know about engineered hardwood installation.
How to install a floating wood plank floor.
Staple or glue planks down.
When working on a clean concrete subfloor the glue down method is often the go to choice.
Treated plywood to the concrete with concrete screws spaced every 16 in.
Unlike traditional solid wood strips a floating floor isn t nailed down.
Other products are better suited for a nail down installation where they are secured to a wood subfloor with nails or staples.
Moisture can pose problems for solid hardwood floors below ground level so engineered wood floors made of layers of wood glued together are the best choice there.
The planks go down fast over virtually any material concrete plywood sheet vinyl even ceramic tile.
Next check the boards for warpage or defects and then remove any bad ones.
Follow these steps to install an engineered wood floor in your home.
How to install engineered wood over concrete engineered wood flooring offers the timeless look of hardwood but is perfect for basements and other areas where moisture can be an issue.
Lay 6 mil polyethylene sheeting over the concrete to minimize moisture migration from the concrete up into the wood flooring.
Installing hardwood flooring over concrete.
It rests or floats on top held in place by the weight of the floor itself.
Some engineered wood flooring products are designed for a glue down application when installing flooring over a concrete slab.
Instead the planks are either glued or snapped together.
Follow these steps to install an engineered wood floor in your home.
It can go where solid hardwood can t.
Alternatively screw rows of treated 1x4s to the concrete 16 in.
Read manufacturer s directions before installation to maintain warranty coverage.
Your very first step before installing engineered hardwood floors over concrete is to let the boards acclimate to the room where they re going to be installed.
Check the manufacturer s recommendations but in most cases it s a minimum of three days with no maximum.
Boards adhere well to the rough surface of the concrete subfloor and therefore lead to less gaps or planks lifting and buckling.
Well not everywhere bathrooms and laundry rooms are still a no go but basements are good.